Please Read These Carefully

Terms and Conditions — Blaze Estimating LLC

calendar_todayLast Updated: March 18, 2026 location_on1942 West Gray Street 1410, Houston TX 77019-4816 gavelGoverned by New York State Law
verifiedUpfront Fixed Pricing
autorenewFree Revisions on Our Errors
lockProject Confidentiality Guaranteed
support_agent24-48 Hour Turnaround
gavelBinding Arbitration Available
🔥 Limited Time: Get 30% Off Your First Estimate. Claim Now
eventLast updated: March 18, 2026

Welcome to Blaze Estimating LLC. These Terms and Conditions govern your use of our construction estimating services. By requesting an estimate or using our services, you agree to these terms.

Read these carefully. They explain what we do, what you can expect from us, and what we expect from you.

1

Services We Provide

buildConstruction Estimating Services

Blaze Estimating LLC provides professional construction cost estimation services, including:

  • check_circleQuantity Takeoffs — Detailed material quantities from your plans and specifications
  • check_circleCost Estimates — Comprehensive pricing for materials, labor, equipment, and overhead
  • check_circleMaterial Takeoff Services — Itemized material lists with quantities and specifications
  • check_circleBudget Estimates — Preliminary cost projections for planning purposes
  • check_circleBid Estimates — Detailed estimates for competitive bidding
  • check_circleValue Engineering — Cost-saving alternatives and recommendations
  • check_circleEstimate Reviews — Analysis and verification of existing estimates

domainProject Types Covered

We estimate all construction project types across all CSI divisions, including:

  • check_circleResidential (single-family, multi-family, renovations, additions)
  • check_circleCommercial (office buildings, retail, restaurants, mixed-use)
  • check_circleIndustrial (warehouses, manufacturing facilities, distribution centers)
  • check_circleInstitutional (schools, healthcare facilities, government buildings)
  • check_circleSpecialty trades (MEP, structural steel, concrete, sitework)

blockWhat We Don't Do

Our services do NOT include:

  • closeEngineering services or engineering calculations
  • closeArchitectural design or design services
  • closeProject management or construction supervision
  • closeLegal advice or contract review
  • closeGuarantee of project final costs
  • closeBidding on your behalf
  • closeDirect purchasing or procurement services
2

How Our Service Works

1

Request Quote

You submit project information and plans through our website, email, or phone. We need:

  • check_circleComplete project plans (architectural, structural, MEP if available)
  • check_circleSpecifications (project specs, scope of work)
  • check_circleProject location (address or zip code at minimum)
  • check_circleTimeline requirements (when you need the estimate)
  • check_circleAny specific requirements or questions
2

We Review & Quote

We review your project and provide:

  • check_circleService pricing (what it will cost for the estimate)
  • check_circleDelivery timeline (typically 24-48 hours for standard projects)
  • check_circleClarifying questions if needed
3

Payment & Work Begins

After you accept our quote:

  • check_circlePayment is required before we start work (unless you have an established account)
  • check_circleWe perform the takeoff and cost calculations
  • check_circleQuality control review by senior estimator
4

Delivery

We deliver your estimate in your requested format:

  • check_circleExcel spreadsheet (detailed line-item breakdown)
  • check_circlePDF report (formatted, professional presentation)
  • check_circleBluebeam markup (on your plans)
  • check_circleCSV file (for import into your software)
3

Pricing and Payment Terms

receipt_longService Fees

Pricing is based on:

  • check_circleProject size and complexity
  • check_circleNumber of trades/divisions required
  • check_circleTurnaround time needed
  • check_circleLevel of detail required
  • check_circleFile format and plan quality

verifiedAll pricing is quoted upfront. No hidden fees.

paymentPayment Methods

We accept:

  • check_circleCredit/debit cards (Visa, Mastercard, American Express)
  • check_circleACH/bank transfer
  • check_circleZelle or Venmo
  • check_circleCheck (for established clients)

schedulePayment Terms

  • check_circleNew clients: Full payment required before work begins
  • check_circleEstablished clients: Net 15 terms available with approved credit
  • check_circleRush projects: 50% upfront, 50% upon delivery
  • check_circleLarge projects: Payment plans available (50% down, 50% on delivery)

warningLate Payments

Invoices not paid within terms are subject to:

  • close1.5% monthly interest charge (18% annually)
  • closeSuspension of services until account is current
  • closeCollection costs and attorney fees if legal action required

replyRefund Policy

We stand behind our work. Refunds are available:

  • check_circleBefore work begins: Full refund minus payment processing fees
  • check_circleAfter work begins: Partial refund for undelivered work only
  • check_circleAfter delivery: No refunds, but we'll revise estimates with legitimate errors at no charge

blockRefunds are NOT available for:

  • closeChanges in market pricing after estimate delivery
  • closeDifferences between estimated and actual contractor bids
  • closeProject changes after estimate completion
  • closeClient's dissatisfaction with construction costs
4

Estimate Accuracy and Limitations

gps_fixedOur Accuracy Commitment

We target 96% accuracy based on the information provided. Our estimates reflect:

  • check_circleCurrent market pricing at time of estimate
  • check_circleRegional cost adjustments for project location
  • check_circleStandard construction methods and materials
  • check_circleTypical site conditions
  • check_circleNormal project schedules

tuneWhat Affects Accuracy

Estimate accuracy depends on:

  • check_circlePlan completeness: Incomplete or sketch plans = less accurate estimates
  • check_circleSpecification clarity: Vague specs require assumptions
  • check_circleSite conditions: Unknown conditions affect accuracy
  • check_circleMarket volatility: Rapidly changing material prices
  • check_circleTimeline: Estimates reflect current pricing, not future costs

infoBasis of Estimates

All estimates are based on:

  • check_circleInformation provided in plans and specifications
  • check_circleStandard construction practices
  • check_circleTypical labor productivity rates
  • check_circleCurrent regional pricing data
  • check_circleNormal site conditions

If actual conditions differ from these assumptions, actual costs will vary.

blockWhat We're NOT Responsible For

  • closeFinal project costs (actual costs depend on contractor pricing, procurement, schedule)
  • closeContractor bid amounts (contractors add their own markup, overhead, and profit)
  • closeFuture material price changes
  • closeSite-specific conditions not shown in plans
  • closeDesign errors or omissions in the plans
  • closeCode compliance or permit requirements
  • closeLabor availability or productivity rates
  • closeSubcontractor pricing variations
5

Revisions and Changes

autorenewFree Revisions

We provide one round of revisions at no charge for:

  • check_circleCalculation errors on our part
  • check_circleMissing items that were clearly shown in plans
  • check_circleQuantity errors in our takeoff
  • check_circleFormat or delivery issues

attach_moneyPaid Revisions

Additional fees apply for:

  • closeProject changes or design revisions
  • closeAdditional scope not in original request
  • closeUpdated pricing (more than 30 days after delivery)
  • closeAlternative material or method pricing
  • closeMultiple revision rounds

Revision pricing is typically 25-50% of original estimate cost, depending on scope of changes.

edit_noteChange Orders

If you need estimates for change orders on an already-estimated project:

  • check_circleSmall changes: Flat fee based on complexity
  • check_circleMajor changes: Quoted separately
  • check_circleMultiple change orders: Volume pricing available
6

Delivery and Timelines

timerStandard Turnaround

  • check_circleSmall projects (under 2,000 sq ft): 24 hours
  • check_circleMedium projects (2,000-10,000 sq ft): 48 hours
  • check_circleLarge projects (over 10,000 sq ft): 3-5 business days
  • check_circleComplex/specialty projects: Quoted based on scope

boltRush Service

Need it faster? Rush service available:

  • check_circleSame-day (within 8 hours): 100% rush fee
  • check_circleNext-day (within 24 hours): 50% rush fee
  • check_circleExpedited (within 36 hours): 25% rush fee

hourglass_emptyDelays

Delivery may be delayed due to:

  • closeIncomplete or unclear plans
  • closeMissing specifications
  • closeUnanswered clarification questions
  • closePayment delays
  • closeForce majeure events (see Section 14)

We'll notify you immediately if delays occur.

sendDelivery Method

Estimates delivered via:

  • check_circleEmail (encrypted for sensitive projects)
  • check_circleSecure file transfer (for large files)
  • check_circleCloud storage link (Dropbox, Google Drive)
  • check_circleYour preferred method (if compatible with our systems)
7

Your Responsibilities

task_altYou Must Provide

  • check_circleComplete plans: All relevant drawings (architectural, structural, MEP)
  • check_circleCurrent specifications: Up-to-date project specs and scope
  • check_circleProject location: Accurate address or zip code
  • check_circleClarifications: Timely responses to our questions
  • check_circlePayment: As agreed in quote acceptance

do_not_disturbYou Must NOT

  • closeMisrepresent project scope or requirements
  • closeProvide outdated or superseded plans
  • closeShare our work product with competitors without permission
  • closeUse our estimates for projects other than the one quoted
  • closeHold us responsible for design errors in your plans
  • closeRepresent our estimates as your own work product

descriptionPlan Quality Requirements

Plans must be readable and clear (legible text, visible dimensions), to scale (or dimensions provided), complete (all relevant sheets included), and current (latest revision). If plans don't meet these standards, we may request clearer files before starting, charge additional fees for interpretation time, or decline the project if plans are inadequate.

8

Intellectual Property and Ownership

folder_sharedYour Work Product

You own your project plans and specifications, your project designs, and your project information. We don't claim any rights to your project.

articleOur Work Product

You receive:

  • check_circleLicense to use: The estimate we prepare for your specific project
  • check_circleRight to share: With your project team (contractors, lenders, partners)
  • check_circleRight to modify: Adjust for your bidding or planning purposes

blockYou do NOT receive:

  • closeRights to our cost databases
  • closeRights to our proprietary methods or formulas
  • closeRights to resell our estimates as your own service
  • closeRights to use our branding or name

lockConfidentiality

We agree to:

  • check_circleKeep your project information confidential
  • check_circleNot share your plans with other clients
  • check_circleNot use your project for marketing without permission
  • check_circleSign NDAs when requested for sensitive projects

You agree to:

  • check_circleNot share our proprietary methods or pricing databases
  • check_circleNot reverse-engineer our cost calculation methods
  • check_circleCredit Blaze Estimating LLC if you share our estimates with third parties
9

Limitation of Liability

verified_userWhat We're Liable For

If we make an error in your estimate, our liability is limited to:

  • check_circleRe-doing the estimate correctly at no charge, OR
  • check_circleRefunding the fee you paid for the estimate

warningThat's it. That's the maximum we're liable for.

remove_circleWhat We're NOT Liable For

We are NOT liable for:

  • closeConsequential damages: Lost profits, lost bids, lost opportunities
  • closeActual project costs: Difference between our estimate and actual construction costs
  • closeContractor pricing: What contractors actually bid on your project
  • closeMarket changes: Material price increases after estimate delivery
  • closeDesign errors: Mistakes or omissions in your plans
  • closeSite conditions: Unknown conditions not shown in plans
  • closeScope changes: Changes to project after estimate completion
  • closeThird-party actions: How contractors, suppliers, or others use our estimates
  • closeDelays: Construction delays or cost impacts from timeline changes
  • closeFinancing: Inability to secure project financing
  • closePermits: Permit costs, delays, or denials

calculateMaximum Liability Cap

In any case, our total liability to you cannot exceed the amount you paid for the specific estimate in question. If you paid $500 for an estimate, our maximum liability is $500.

hourglass_bottomStatute of Limitations

Any claims against Blaze Estimating LLC must be brought within one (1) year of the estimate delivery date. After one year, you waive all claims.

infoWhy These Limitations

Here's the reality: We charge hundreds of dollars for estimates. Construction projects cost hundreds of thousands or millions of dollars. We can't insure against all potential outcomes of a construction project. These limitations allow us to provide affordable estimating services. If you need higher liability coverage, talk to us about professional liability insurance or bonded estimates (additional fees apply).

10

Disclaimers and Warranties

ruleNo Warranty of Final Costs

We warrant that we'll perform our estimating services professionally and competently. We do NOT warrant:

  • closeThat your project will cost what we estimated
  • closeThat contractors will bid at our estimated amounts
  • closeThat material prices won't change
  • closeThat your design is complete or accurate
  • closeThat you'll win bids using our estimates
  • closeThat your project will be profitable

psychologyProfessional Judgment

Our estimates involve professional judgment and interpretation. Different estimators may arrive at different numbers. We apply industry-standard methods, but estimating is not an exact science.

trending_upMarket Conditions

Construction markets fluctuate. Pricing can change due to material supply shortages, labor availability, economic conditions, regional demand, seasonal factors, and fuel costs. We reflect current market conditions at the time of the estimate. We can't predict future changes.

11

Dispute Resolution

forumFirst Step: Talk to Us

If you have an issue with our estimate:

  • check_circleContact us immediately at plans@blazeestimating.com or +1 (713) 493-0391
  • check_circleExplain the specific issue or error
  • check_circleWe'll review and respond within 48 business hours
  • check_circleMost issues are resolved through simple communication

handshakeMediation

If we can't resolve the issue directly, we agree to:

  • check_circleAttempt mediation before any litigation
  • check_circleUse a neutral third-party mediator
  • check_circleSplit mediation costs 50/50
  • check_circleMediate in good faith for at least one session

gavelArbitration

If mediation fails, disputes will be resolved through binding arbitration:

  • check_circleAmerican Arbitration Association (AAA) rules
  • check_circleOne arbitrator mutually agreed upon
  • check_circleLocation: New York, New York
  • check_circleArbitrator's decision is final and binding
  • closeNo class actions or consolidated claims

account_balanceGoverning Law

These Terms are governed by New York State law, without regard to conflict of law principles.

group_offNo Class Actions

You agree to bring claims individually, not as part of any class or representative action. No class arbitrations or class actions are permitted.

12

Termination

cancelYou Can Cancel

You can cancel services:

  • check_circleBefore work begins: Full refund minus processing fees (3-5%)
  • check_circleDuring work: Partial refund for undelivered work
  • check_circleAfter delivery: No refund

do_not_disturb_onWe Can Cancel

We reserve the right to refuse or terminate services if:

  • closePayment is not received as agreed
  • closePlans are inadequate or illegible
  • closeYou violate these Terms
  • closeThe project involves illegal activity
  • closeYou're abusive or threatening to our team

If we cancel due to your breach, no refund is provided.

13

Indemnification

You agree to indemnify and hold harmless Blaze Estimating LLC, its owners, employees, and contractors from:

  • check_circleClaims arising from your use of our estimates
  • check_circleClaims that your plans infringe third-party rights
  • check_circleClaims arising from design errors in your plans
  • check_circleClaims from your contractors, subcontractors, or suppliers
  • check_circleAny misrepresentation of our estimates to third parties
  • check_circleAny breach of these Terms by you

warningImportant

This means if someone sues us because of something you did with our estimate, you pay for our defense and any damages.

14

Force Majeure

We're not liable for delays or failures due to circumstances beyond our control, including:

  • check_circleNatural disasters (earthquakes, floods, hurricanes)
  • check_circleActs of war or terrorism
  • check_circleGovernment actions or regulations
  • check_circlePandemics or public health emergencies
  • check_circleStrikes or labor disputes
  • check_circleInternet or power outages
  • check_circleSoftware or hardware failures
  • check_circleSupplier failures (cost database providers, software vendors)

If force majeure delays delivery, we'll notify you and work to resolve as quickly as possible.

15

Website Use and Electronic Communications

languageWebsite Terms

When using blazeestimating.com, you agree to:

  • check_circleProvide accurate information
  • check_circleNot attempt to hack or breach security
  • check_circleNot use automated systems to scrape data
  • check_circleNot upload malware or viruses
  • check_circleNot impersonate others

mark_email_readElectronic Communications

You consent to receive estimates and invoices electronically, electronic signatures on agreements, and email communication as the primary method. Electronic communications have the same legal effect as paper documents.

16

Miscellaneous

assignmentEntire Agreement

These Terms, along with our Privacy Policy and any written quote or agreement, constitute the entire agreement between you and Blaze Estimating LLC. No verbal agreements or representations are binding unless in writing.

updateAmendments

We may update these Terms. Changes are posted on our website with a "Last updated" date. Continued use of services after changes = acceptance. Material changes will be emailed to active clients.

call_splitSeverability

If any provision of these Terms is found unenforceable, the remaining provisions remain in full effect.

redoWaiver

Our failure to enforce any provision doesn't waive our right to enforce it later. Waiver of one breach doesn't waive subsequent breaches.

swap_horizAssignment

You can't transfer or assign your rights under these Terms without our written consent. We can assign these Terms to a successor company or buyer of our business.

peopleNo Partnership

These Terms don't create a partnership, joint venture, or employment relationship. We're independent contractors.

restart_altSurvival

Provisions that naturally survive termination (payment obligations, liability limitations, indemnification, dispute resolution) remain in effect.

17

Special Provisions for Different Client Types

engineeringGeneral Contractors

If you're using our estimates for bidding:

  • check_circleVerify all quantities before bidding
  • check_circleAdd your own overhead and profit margins
  • check_circleAdjust for your specific labor rates and productivity
  • check_circleConfirm current material pricing with suppliers
  • check_circleWe're not liable if you lose money on the project

apartmentDevelopers and Owners

If you're using our estimates for budgeting:

  • check_circleAdd appropriate contingencies (10-20%)
  • check_circleFactor in financing costs and timeline
  • check_circleGet contractor bids to validate estimates
  • check_circleUpdate estimates if project timeline extends
  • check_circleWe're not liable for construction cost overruns

architectureArchitects and Engineers

If you're using our estimates for design budgeting:

  • check_circleUpdate estimates as design develops
  • check_circleInform clients our estimates are preliminary
  • check_circleGet updated estimates at each design phase
  • check_circleWe're not liable for design-phase estimate variations

homeHomeowners

If you're a homeowner using our services:

  • check_circleOur estimates help you understand project costs
  • check_circleGet multiple contractor bids before proceeding
  • check_circleContractor bids may be higher (their profit, warranty, overhead)
  • check_circleDon't start work based solely on our estimate
  • check_circleWe're not liable for actual contractor pricing
18

Questions About These Terms

If you have questions about these Terms and Conditions:

businessBlaze Estimating LLC

location_on1942 West Gray Street 1410, Houston TX 77019-4816
phonePhone: +1 (713) 493-0391
scheduleBusiness Hours: Monday–Sunday, 9am–9pm EST

We're happy to explain any provisions or discuss specific project requirements.

19

Acceptance of Terms

task_alt

By Using Our Services, You Agree

By using our services, you acknowledge that you have read, understood, and agree to be bound by these Terms and Conditions.

If you don't agree with any part of these Terms, don't use our services.

When you submit a project for estimation or make a payment, you're accepting these Terms.

20

SMS Terms of Service

smsSMS / Text Messaging Program

By providing your phone number and opting in via our contact form, you agree to receive text messages from Blaze Estimating LLC related to your construction estimating projects and our services. Consent is not a condition of purchase.

messageTypes of Messages You Will Receive

When you opt in to our SMS program, you may receive the following types of messages:

  • check_circleEstimate request confirmations and project status updates
  • check_circleClarification questions from our estimating team about your project
  • check_circleEstimate delivery notifications and order alerts
  • check_circleInvoice reminders and payment confirmations
  • check_circleAppointment reminders for consultations or project reviews
  • check_circleAccount notifications related to your project or service request
  • check_circlePromotional offers and service updates (only if separately consented to)

speedMessage Frequency & Rates

  • check_circleMessage frequency may vary depending on your project activity and the stage of your estimate.
  • check_circleMessage and data rates may apply depending on your mobile carrier and plan.
  • check_circleBlaze Estimating LLC is not responsible for any charges incurred from your mobile carrier.

exit_to_appHow to Opt Out (STOP)

You may cancel SMS communications at any time:

  • check_circleReply STOP to any text message to unsubscribe immediately
  • check_circleAfter texting STOP, you will receive one final confirmation message and no further messages will be sent
  • check_circleYou may also email plans@blazeestimating.com to request removal from our SMS list
  • check_circleOpting out of SMS will not affect your ability to use our estimating services

check_circleHow to Opt-In

You may opt in to receive SMS text messages from Blaze Estimating LLC through the following method:

  • check_circleWebsite Contact Form: Visit our contact page at https://blazeestimating.com/contact-us/, provide your phone number, and check the SMS consent checkbox that reads: "I consent to receive customer care text messages from Blaze Estimating LLC."
  • check_circleThe checkbox is unchecked by default — you must actively tick it to give consent.
  • check_circleConsent is not a condition of purchase — you can request an estimate without opting in to SMS.
  • check_circleBy checking the box and submitting the form, you confirm you are the account holder or have permission to use the phone number provided.
  • check_circleYou will receive a confirmation message once your opt-in is processed.

verifiedYour Consent Is Recorded

When you opt in via our contact form, your consent is recorded along with the date, time, and the phone number provided. This record is kept in compliance with TCPA requirements.

help_outlineHow to Get Help (HELP)

blockNo Third-Party Sharing of SMS Data

SMS opt-in consent and phone numbers collected for text messaging are never shared, sold, rented, or transferred to any third party, affiliate, or partner for marketing or any other purpose. This policy is strictly enforced in compliance with TCPA regulations and carrier guidelines.

policyApplicable Policies

Our SMS program is governed by the following policies. Please review them carefully:

signal_cellular_altCarrier Disclaimer

Carriers (AT&T, T-Mobile, Verizon, etc.) are not liable for delayed or undelivered messages. Message delivery depends on your carrier network and device compatibility. For support, visit blazeestimating.com or email plans@blazeestimating.com.

Ready to Get Accurate Estimates?

Upload your plans and get a fixed quote within an hour. 24-48 hour turnaround. All trades covered.

5,500+ projects delivered. Nationwide service. No contracts required.

No contracts • Pay per project • 20/7 support available