⚡ Limited Time: Get 30% Off Your First Estimate. Send Your Plans Now to Claim It
All MasterFormat CSI Divisions

Every Construction Trade.
One Estimating Team.

From concrete foundations to rooftop finishes, we cover all CSI trades with precise material takeoffs, labor calculations, and cost analysis. All states. 24–48 hour turnaround. No trade left behind.

layers
All CSI
Trades Covered
verified
96%
Accuracy Guaranteed
schedule
24–48h
Turnaround
map
All
States
foundationStructural & Concrete
electrical_servicesElectrical & MEP
roofingEnvelope & Thermal
format_paintFinishes & Interiors
landscapeSitework & Civil
Complete Trade Coverage

Construction Trades We Estimate

Every trade listed here comes with full material and labor takeoffs, CSI division organization, and Excel delivery. If your project spans multiple trades, we cover all of them in one estimate — organized, detailed, and ready to use for bidding or budgeting.

search
search_off

No trades match your search. Try a different keyword.

foundation

Structural, Concrete & Masonry

Foundations, framing, steel, concrete systems, masonry work
6 Trades
layers

Concrete Estimating

Foundations, slabs-on-grade, elevated decks, walls, columns, piers, and all cast-in-place and precast systems. We quantify formwork, rebar, mix design, and placement labor separately.

CSI Div 03FormworkPrecast
View Service arrow_forward
view_in_ar

Rebar Takeoff

Complete rebar quantity takeoffs including bar sizes, lengths, bending schedules, lap splices, ties, and welded wire mesh. Organized by pour and structural element for easy procurement.

CSI Div 03Bending SchedulesWWM
View Service arrow_forward
grid_on

Masonry Estimating

CMU block, brick, stone veneer, mortar, grout, lintels, reinforcing, ties, and all masonry accessories. Labor estimates include laying rates by unit type and wall configuration.

CSI Div 04CMUBrick & Stone
View Service arrow_forward
schema

Steel Estimating

Wide flanges, HSS, angles, channels, plates, bolts, welds, and connections. We produce shop drawing-level takeoffs covering fabrication and erection labor with crane and equipment costs included.

CSI Div 05FabricationErection
View Service arrow_forward
straighten

Metals Estimating

Stairs, railings, ladders, grating, pipe columns, metal decking, door frames, lintels, and all miscellaneous and ornamental metalwork. Detailed takeoffs by item type and finish.

CSI Div 05RailingsMetal Decking
View Service arrow_forward
cabin

Lumber Estimating

Rough framing lumber, engineered wood products, trusses, sheathing, blocking, headers, and connectors. Full framing packages organized by floor, wall, and roof system with linear and board-foot quantities.

CSI Div 06Rough FramingEWP
View Service arrow_forward
electrical_services

Mechanical, Electrical & Plumbing (MEP)

Complete MEP systems, piping, ductwork, and utilities
8 Trades
settings_suggest

MEP Estimating

Complete mechanical, electrical, and plumbing estimates in a single coordinated package. Ideal for GCs and project managers who need all three trades priced together without gaps or overlaps.

Div 22–26CoordinatedFull Scope
View Service arrow_forward
settings

Mechanical Estimating

Air handling units, chillers, boilers, pumps, cooling towers, fans, VAV systems, and all mechanical equipment. Labor estimates built from actual installation man-hours, not rule-of-thumb percentages.

CSI Div 23HVAC EquipmentControls
View Service arrow_forward
air

HVAC Estimating

Rooftop units, split systems, VRF systems, exhaust fans, unit heaters, and all HVAC equipment. We price new construction, replacement, and retrofit work with regional labor rates built in.

CSI Div 23RTUsVRF Systems
View Service arrow_forward
device_hub

Duct Estimating

Sheet metal ductwork, flex duct, duct lining, dampers, diffusers, grilles, registers, and all HVAC distribution components. Quantities in linear feet and square footage with gauge and insulation noted.

CSI Div 23Sheet MetalDistribution
View Service arrow_forward
bolt

Electrical Estimating

Service and distribution, conduit and wire, lighting, panels, switchgear, motor controls, grounding, and low-voltage systems. Estimates include full labor takeoffs using ConEst, Trimble, and Accubid.

CSI Div 26PowerLighting
View Service arrow_forward
water_drop

Plumbing Estimating

Domestic water, sanitary drainage, vent systems, fixtures, rough-in, water heaters, and all plumbing systems. Takeoffs organized by system type with pipe materials, fittings, and fixture counts broken out separately.

CSI Div 22FixturesDrainage
View Service arrow_forward
water

Piping Estimating

Process piping, industrial piping systems, compressed air, steam, chemical lines, supports, hangers, and specialty piping. Line-by-line takeoffs by pipe size, material, and spec class.

CSI Div 22–23ProcessIndustrial
View Service arrow_forward
water_damage

Gutter Estimating

Gutters, downspouts, scuppers, splash blocks, and rainwater management systems. Quantities in linear feet by type and size with all accessories and hangers included in the takeoff.

CSI Div 07RainwaterDrainage
View Service arrow_forward
roofing

Building Envelope & Thermal

Roofing, insulation, openings, thermal protection, and fireproofing
5 Trades
roofing

Roofing Estimating

TPO, EPDM, modified bitumen, built-up roofing, metal panels, shingles, and all roofing systems. Estimates include decking, insulation, flashings, edge metal, drains, and all associated accessories.

CSI Div 07Low-SlopeSteep-Slope
View Service arrow_forward
thermostat

Insulation Estimating

Batt, blown, rigid board, spray foam, pipe insulation, duct wrap, and mechanical insulation. Takeoffs by square footage or linear foot with R-value and thickness noted throughout.

CSI Div 07ThermalMechanical Insul.
View Service arrow_forward
shield

Thermal & Moisture Protection

Below-grade waterproofing, plaza deck systems, balcony waterproofing, drainage boards, and dampproofing membranes. We include substrate prep, termination details, and inspection costs in every estimate.

CSI Div 07WaterproofingBelow-Grade
View Service arrow_forward
local_fire_department

Fireproofing Estimating

Spray-applied fireproofing (SFRM), intumescent coatings, board products, and firestopping systems. Takeoffs include tonnage of steel to be protected, thickness, and all related labor and material.

CSI Div 07SFRMIntumescent
View Service arrow_forward
sensor_door

Openings Estimating

Doors, frames, hardware, windows, storefronts, curtain wall systems, and specialty glazing. Takeoffs include all rough openings, unit types, hardware sets, and installation labor broken out by opening type.

CSI Div 08Doors & FramesGlazing
View Service arrow_forward
format_paint

Interior & Exterior Finishes

Drywall, flooring, painting, millwork, and complete finishes packages
5 Trades
grid_view

Drywall Takeoff

Metal stud framing, gypboard, tape, mud, corner bead, and all drywall accessories. Takeoffs cover walls, ceilings, soffits, shafts, and special assemblies with fire and acoustic ratings noted.

CSI Div 09Metal StudGWB
View Service arrow_forward
crop_free

Flooring Estimating

Carpet, LVT, VCT, ceramic and porcelain tile, hardwood, polished concrete, epoxy coatings, and all flooring systems. Quantities by room and area type with substrate prep, transitions, and adhesives included.

CSI Div 09LVTTile & Carpet
View Service arrow_forward
brush

Painting Estimating

Interior and exterior painting, primers, special coatings, surface prep, masking, protection, and all painting labor. Estimates broken down by surface type, coat system, and square footage for accurate subcontractor pricing.

CSI Div 09InteriorExterior
View Service arrow_forward
weekend

Millwork Estimating

Custom millwork, modular casework, cabinetry, countertops, trim, wainscoting, and finish carpentry. Every component detailed with species, finish, hardware, and installation requirements noted.

CSI Div 06Custom MillworkCasework
View Service arrow_forward
auto_awesome

Interior & Exterior Finishes

All finishes in a single coordinated estimate — drywall, flooring, painting, tile, ceilings, and millwork in one package. Organized by room type and building area for straightforward procurement and bidding.

CSI Div 09Full PackageCoordinated
View Service arrow_forward
landscape

Sitework & Landscaping

Earthwork, site development, and exterior landscaping
2 Trades
terrain

Sitework Estimating

Clearing, grubbing, rough and finish grading, cut and fill calculations, erosion controls, and all earthwork operations. We include equipment hours, haul distances, and compaction requirements in every estimate.

CSI Div 31GradingCut & Fill
View Service arrow_forward
park

Landscaping Estimating

Planting plans, trees, shrubs, groundcover, sod, seed, irrigation systems, landscape lighting, site furnishings, and exterior hardscape. Plant counts, irrigated areas, and all exterior finish site work quantified.

CSI Div 32PlantingIrrigation
View Service arrow_forward
home

Looking for a full-service construction estimating partner?

Blaze Estimating is a leading Construction Estimating Company serving contractors, developers, and builders across all states. From single-trade takeoffs to complete multi-division estimates, we cover every project type and building category nationwide.

About Our Trade Coverage

Why Contractors Bring Every Trade to Blaze

Most estimating firms specialize. They do electrical. Or concrete. Or mechanical. That works fine until you're managing a project that touches six trades at once and you need consistent, coordinated estimates that don't contradict each other. We built Blaze Estimating to handle everything in one place.

When you send us a full set of drawings, our team assigns trade-specific estimators to each scope, then coordinates the output into a single deliverable organized by CSI division and ready to use. No gaps. No scope overlap. No "that's not our trade."

check_circleProfessional estimators per trade, not one generalist doing everything
check_circleAll trades organized under MasterFormat or UniFormat structure
check_circleColor-coded markup plans delivered with every estimate
check_circleSenior estimator review before every deliverable goes out
7,900+
Projects Completed
Commercial, residential, industrial, and institutional
96%
Accuracy Guaranteed
Maintained across all trade types and project sizes
24–48h
Turnaround Time
For most single and multi-trade scopes

How It Works

Four steps from drawings to a completed estimate — regardless of how many trades your project covers.

1

Send Your Drawings

Upload plans in any format — PDF, DWG, DXF, Revit, or photos of hand drawings. We take what you have.

2

We Confirm Scope

We review your documents, identify which trades apply, and confirm turnaround time and pricing within a few hours.

3

Takeoffs & Pricing

Trade-specific estimators complete detailed takeoffs. Pricing is pulled from regional databases and validated against current market data.

4

Receive Deliverables

Excel sheets in MasterFormat or UniFormat, color-coded markup plans, and a PDF summary — organized, clean, and ready to use.

What You Get

What We Deliver on Every Trade Estimate

Every estimate — single trade or multi-trade — comes with the same complete deliverable package. No extras, no add-ons.

table_chart

Excel Sheets (MasterFormat / UniFormat)

Line-by-line quantities, unit costs, material totals, labor hours, and cost totals organized by CSI division. Formula-driven and fully editable for your own markup and review.

map

Color-Coded Marked-Up Plans

Digital plans with every item highlighted by trade and color. Traceable, organized by layer, and ready to share with subcontractors or use during bid reviews.

picture_as_pdf

PDF Summary Report

A professional summary with executive overview and full cost breakdown. Clean enough to present to an owner or investor without extra formatting on your end.

Ready to Estimate Your Project Across Every Trade?

Send us your drawings and we'll handle the rest. Single trade or all divisions — our team has you covered from the foundation to the roof, in every state.

Accurate numbers. Fast turnaround. No shortcuts.

We respond fast during business hours. Most quotes confirmed same day.